Clark Pool Interiors - Services & Maintenance

 

JEWELS 4 POOLS

.Jewels 4 Pools Product is guaranteed non-fade 100% Pure glass finish with special formulated Geo Polymer. Imagine your pool lined in pure glass with any combination of colours you wish to choose.

Imagine a finish so smooth and vibrant, Guaranteed never to fade.

Jewels 4 Pools is backed by 40 years experience in the pool industry.

Their technical adviser has personally been responsible for major changes in the pool plastering industry for over 40 years and continues to be the leader in innovative and highly durable new products.

Jewels 4 Pools is not only distributed across Australia but also distributed world wide.

FEATURES

  • Totally safe, non toxic

  • 100% pure glass

  • No value Adding or bulking up

  • Direct from manufacturer, wholesaler, and distributor

  • Extensive use world wide

  • Proven durability

  • Guaranteed never to fade, ever

  • No maximum shelf life

  • 100′s of applications. Pools, Gardens, Ponds

  • Available in grades up to 10mm

  • Specific grading for pool renders

  • 100′s of colours and combinations to choose from

  • Photo luminescent aggregates (glow in the dark)

APPLICATION

The application is carried out by Clark Pool Interiors and the method is no different from that of any other standard exposed aggregate plaster finish.

ORIGINAL

As a general rule the crystal is mixed with pure white or off white cements at a ratio of 2:1 aggregate to cement mix

GEO POLYMER

Geo Polymer is a specifically designed polymer additive for pool renders especially those containing pure glass. The use of Jewels 4 Pools state of the art Geo Polymer is combined requiring additions of more than 30% crystal. It can be used with white or off white cements and or oxides.

Jewels 4 Pools - Product Maintenance

With Jewels 4 Pools your maintenance requirements will be greatly reduced. However there are a few important facts you should know. Note: Calcium scale can form on the surface of the crystal if the following steps are not adhered to.

  • Once full, your pool will need to be BROOMED down all over to prevent scale buildup. This should be carried out as often as possible during the curing time of the cement (approx 28 days). You will require an appropriate pool broom and cleaning pole.

  • Do not rely on automatic pool cleaners for this.

  • We advise not to use pool cleaners on the pool for the first 28 days.

  • Chemical balance is also important and manual testing as well as brooming should be carried out at least once a week.

  • The water line should also be cleaned with a scourer and appropriate cleaning agent on a regular basis.
    As a guide we recommend the following:
    PH 7 -7.4
    ALKALINITY aprox 100ppm
    CHLORINE aprox 3ppm
    This is a guide only and as all pools vary it is sometimes best to consult a professional on your pool’s specific requirements.